Georgetown, Texas

Tile installation in Georgetown

We drive south on I-35 from Killeen to Georgetown to look at your room, measure it, and set the tile you pick for showers, floors, or a curbless stall.

What we publish a price for. Those are the only prices on this site. Anything else, call (512) 297-7493 and we will look at the room and come back with a straight quote.

Tile jobs in Georgetown from the courthouse square to Sun City

Georgetown sits south on I-35 in Williamson County. The courthouse square is downtown and Sun City is the large retirement community. Many jobs here are curbless showers and low threshold work for aging in place. We also install standard showers, tub surrounds, backsplashes and floors. The tile you choose is what we set, whether you bring it or we go with you to the Temple supply house. That covers zellige, marble, porcelain, ceramic, terrazzo and mosaic. Visible edges get brass or satin profiles.

Tub surround tile work is $2,000 flat. For everything else on a Georgetown job you call for a straight quote after we look at the room. Floors get tile, and we handle the vinyl plank if that is the pick, plus the reducers, stair nose and thresholds that finish the edges. Layout matters. A bad layout shows in the cuts at the walls and around the drain. We measure the actual space so the pattern lands right. If the existing floor has to come up, that is part of the quote. Old thinset that is not bonded will cause tiles to pop later.

Substrates we run into on Georgetown tile work

Concrete slab is what we find under most floors in Georgetown. Some of the older stock around the courthouse square has wood that has given a little. We check level with a long straightedge. If it is more than an eighth of an inch out over a few feet the tile will show it. Cracks in the slab get looked at. Hairline ones we can go over after prep. Wider ones may need work so they do not telegraph through the new tile. For showers the wall substrate has to take the waterproofing membrane. Old greenboard fails. We replace what is not sound. Moisture coming up from the slab can break the bond if we do not catch it.

  • Concrete slab out of level more than an eighth of an inch over a few feet
  • Existing tile that sounds hollow and will not hold a new set
  • Damaged cement board or greenboard on shower and tub walls
  • Missing slope of a quarter inch per foot on a shower floor
Flooring carried across an open plan with the seams and direction planned around the light.
Flooring carried across an open plan with the seams and direction planned around the light.

Getting a Georgetown tile job scheduled from Killeen

The shop sits in Killeen. Georgetown is south down I-35. You reach us at (512) 297-7493 or info@merlanstile.com. We come to the house, stand in the room, and measure the real dimensions. Walls bow. Floors dip. That visit produces the quote. Genaro Merlan and whoever will set the tile are the ones who see the substrate and the layout problems in person.

After measurements you choose the tile. Bring what you have or ride with us to the Temple supply house so the lot numbers match. When the boxes are on the ground we talk by phone and pick the days. On a job like this it tends to run several days for a full shower after the old material is out and the substrate is prepped. We grout, seal, and clean up. Scheduling stays on the phone. Nothing is locked until that conversation.

Curbless and low threshold showers for aging in place in Sun City

A lot of Sun City work is a shower with no curb so a wheelchair or walker rolls straight in. The bathroom floor tile continues into the stall. We form a quarter inch per foot slope to the drain. A linear drain lets the tile run without a center hole interrupting the pattern. The waterproofing is a bonded sheet membrane stuck to a solid wall and floor substrate. Every overlap, corner, and the drain clamping ring gets detailed so water stays inside.

Standing water is the usual failure if the slope comes out shy. A leak shows up later if a seam in the membrane was skipped or the drain was not tightened. We look at the substrate first. If the old pan or board is rotten it comes out. Porcelain mosaic or small format tile on the floor helps with traction and with forming the plane. Large tile fights the slope. Brass or satin profiles cap the edges that meet the dry floor. Grout gets sealed. The stall has to work for someone who needs sure footing.

Setting, grouting, sealing and the labor warranty on Georgetown installs

Thinset goes down and the tile is set to the layout we marked after measuring. We start where the eye lands first so leftover cuts hide under vanities or in corners. Spacers keep joints even. A level and a beating block keep the face plane. Lippage on a large porcelain tile is the thing that shows if the substrate was not flattened. After cure we grout, wash the haze, and apply sealer to the joints. Extra pieces stay with you. The floor or shower is left clean.

Every installation carries a written one-year limited labor warranty from the date of completion. It covers issues arising from the original installation. It does not cover materials. Those fall under the manufacturer's own warranty. It does not cover modifications made after the installation is complete. A tile that loosens because the thinset missed a spot is our problem that year. A crack from a later plumber or a grab bar you added is not.

Questions

Asked and answered

How far is the drive and how do you time a Georgetown visit from Killeen?

We come south on I-35 when you call (512) 297-7493. The look at the room happens first so the quote matches the substrate and the cuts. After you pick tile at the Temple house or from your own stock we set the work days by phone. Most of the time the on site work for a shower tends to run several days once we start. We do not give a start date until the material is confirmed and we have talked.

Can you build a curbless shower over a Georgetown slab?

Yes if the slab will take a quarter inch per foot slope and a bonded membrane. We inspect for cracks and any moisture coming through. Sometimes the drain has to be reset lower. If the adjacent floor is too close in height we tile a gentle threshold instead of a true zero curb. Dusty concrete gets ground so the membrane sticks. Call (512) 297-7493 so we can see the room and give a straight quote. Rotten old pan material comes out first.

What kinds of tile work on a shower floor in Georgetown?

You decide the material. We set zellige, marble, porcelain, ceramic, terrazzo or mosaic from the Temple supply or from boxes you supply. For the floor of a wet stall I like a small mosaic or a porcelain with some texture because it grips and it bends to the slope without looking broken. Big polished pieces fight the quarter inch per foot and can be slick. Walls can take the larger formats. We cut them and use the brass or satin profiles on any exposed edge.

Who shows up to do the Georgetown tile after you quote it?

The same people who walked the room. Genaro Merlan measures in Georgetown and either sets the tile himself or the hands that were with him that day do the work. Notes about the slab cracks or the out of square walls stay with the crew. You are not getting a different installer who never saw the substrate. If we open a wall and find wet wood we stop and talk before going further. That is how the job stays on the quote we gave.

What is and is not covered by the labor warranty?

The written one-year limited labor warranty starts the day we finish and leave. It covers faults that come from the original installation, a hollow tile, a grout crack from our mix, a leak at a membrane we installed. Materials stay with the maker’s warranty. Anything you or another trade change after we are done is outside it. We leave the written terms with you. Call the shop if something shows up in that year and we will look at whether it is from the set.

Get a quote

Tell us about the room.

Square footage, the tile you have in mind and when you want it done. We come back with a number for the whole job.

Every installation carries a written one-year limited labor warranty from the date of completion. It covers issues arising from our original installation. It does not cover materials, which fall under the manufacturer’s own warranty, and it does not cover modifications made after our installation is complete.