- Tub surround tile work: $2,000 flat.
- Kitchen backsplash tile work: $1,000 flat, labor.
- Tile floors: $3 per square foot labor, or $2 per square foot labor on jobs of 2,000 square feet or more.
Kitchen backsplash tile for houses along US 190 in Nolanville
Nolanville sits on US 190 between Harker Heights and Belton. New subdivisions have been going in and those kitchens need a backsplash. I work out of Killeen so the drive is short. We arrange scheduling on the phone after you call. I come look at the room and measure the actual space, not a sketch. The wall above the counters is what it is, with outlets and the range sitting where the builder put them. You pick the tile. Bring what you already bought or we go together to the Temple supply house and you choose there.
Kitchen backsplash tile work is $1,000 flat, labor. That covers setting, the cuts around boxes, grout, sealer when the tile needs it, and cleaning the dust when we leave. Material is yours from the Temple supply house or whatever you bring. I do not add to the labor figure for the tile. The same person who measured is the one who sets it. Genaro Merlan. If the drywall bows the tile plane will show it unless we discuss shims or a change in layout. Outlets set too deep or too proud leave the plates sitting wrong. We see the boxes on the visit and plan the cuts then.
Starting the layout off the counter then cutting every outlet and switch box
Once the counters are set I start the backsplash layout from that line. A ledger board holds the first course if the bottom joint needs to be even. Joints should not leave a skinny piece against the upper cabinets or the hood. I dry lay a few tiles to see how the pattern falls across the longest run. Outlet and switch boxes are never in a perfect grid. Each one gets measured from the nearest grout line I have already decided. I mark the back of the tile, cut it, test fit, then set it with thinset. Marble needs a different blade than porcelain. Zellige has variation so I mix the boxes as I go. Terrazzo and mosaic take more time on the cuts. If the box sticks out the tile sits off the wall. If it is recessed the plate will rock. We note that on the first visit.
- Dry lay a few tiles to check the pattern before thinset.
- Measure every outlet from the grout lines already chosen.
- Mix tiles from different boxes when the material has shade variation.
- Test the cut piece on the box before setting it for good.

Tiling to the hood, returning a window, and finishing an exposed edge
The range wall often runs up to a hood. I tile to the hood or leave a caulk joint if the hood sits proud. Some hoods have a chimney that needs tile around three sides. That means returns and more cuts. A window over the sink is common in these kitchens. The sides of the window get tiled as returns so you do not see drywall. The sill can stay laminate or we tile it too if you want, but that is extra material and extra cuts. Water likes to sit on a sill, so the grout and caulk there have to be tight. An exposed end of the backsplash, where it stops at the end of the counter or next to a fridge, needs a finished edge. Brass and satin profiles cap that last row. They come in a few widths. I set the profile in the thinset with the last tiles so it is bonded, not caulked on later.
When I am in the kitchen I look at the drywall and any existing tile. Painted drywall takes thinset after a scrape if the paint is glossy or loose. Old mastic has to come off or the new tile will not bond. A window that is out of square means the returns get scribed. I cut the tile to follow the frame, then caulk the small gap. That joint will move with the seasons. The exposed edge gets the brass or satin profile chosen at the supply house. I embed it in the thinset bed with the adjacent tiles so everything is one assembly. If you leave the end raw the grout there crumbles and the wall shows.
Full height versus standard field height and picking grout behind the cooktop
A standard backsplash field usually stops a few inches above the counter and under the wall cabinets. Full height means the tile keeps going to the ceiling or to the bottom of the cabinets on every wall. Stone look porcelain or actual marble in full height changes the whole room. It also means more cuts at every outlet, the hood, and any window. The extra tile is still your purchase at the Temple house. Layout gets harder because the joints have to stay straight over a taller run. I use a level more and check for lippage every few rows. If the wall is not flat the taller job shows every dip. We decide together after I measure whether full height makes sense for that kitchen.
Grout choice matters most behind the cooktop. Light grout shows every splatter. A mid gray or a color close to the tile hides better. You see the samples at the supply house. I grout after the thinset has set, usually the next day on a job like this. I pack the joints, tool them, and sponge until the haze is gone. Then sealer if needed. Marble always gets sealed. Some ceramics do too. I tell you on the visit what the tile you picked will need. Skip the sealer and cooking oil soaks in. The cooktop wall is the one place a homeowner notices first if the grout goes south.
The visit from Killeen, final cleanup, and the written one-year limited labor warranty
Call (512) 297-7493 or send a note to info@merlanstile.com when you are ready for me to look at the Nolanville kitchen. I drive over from Killeen, measure the walls, note the outlets, the hood, any window, and the end conditions. We talk through full height or standard, grout color, and which edge profile. Labor for this kitchen backsplash is $1,000 flat. That is the figure, published so you know before I come. Other work such as a shower or a floor gets a straight quote after I see that room. Same person quotes and sets. No handoff.
After grout and sealer the room gets a final wipe. I take the tools, the leftover thinset bags, the cut offs, and the empty boxes. You should have a clean kitchen. The written one-year limited labor warranty is on paper from the date we complete. It covers issues arising from the original installation. Materials stay under the maker's warranty. If you remodel again or another contractor cuts into the tile later, that part is outside the labor warranty. Keep the paper. If something from the set fails, phone and I come back to look at it.