Service

Tile removal and demolition

Tearing out old tile and thinset is the loudest, dustiest part of a tile job, and also the part that shows you exactly what is going on underneath the floor or walls you walk on every day.

What we publish a price for. Those are the only prices on this site. Anything else, call (512) 297-7493 and we will look at the room and come back with a straight quote.

What tile demolition actually involves

Getting tile off a slab or a wood subfloor is not a quiet process. We bring rotary hammers with chisel bits, floor scrapers, and a lot of buckets. The goal is to strip everything down to the substrate: the bare concrete or the plywood subfloor that was covered up years ago. On a slab, the thinset from the original install is often still solid, and getting it flat again takes time. On a wood subfloor, we have to be careful not to blow through the plywood or damage joists while breaking the bond.

You hear the hammer running for a good stretch, and even with vacuum shrouds on the tools and zip walls sealing the work area, fine silica dust is part of the reality. We run HEPA dust extractors attached to the demo hammer to catch what we can at the source, and we wet down debris before shoveling it out. By the time the room is bare, you can see every crack, every low spot, and every place the old thinset did not bond. That view of the substrate is what tells us how much prep the new tile will need.

What the substrate usually looks like after we strip it

A concrete slab that had tile on it rarely comes out glass smooth. You see ridges from the old trowel lines, spots where the original thinset let go, and often a crack or two that the old tile was hiding. A crack running through the slab does not mean the house is falling down. It usually means the concrete did what concrete does over time, and we need to address it before new tile goes on so the crack does not telegraph up through the new grout joints.

On a wood subfloor, you might find old vinyl glue, staples, or patches of backer board somebody screwed down years ago. Sometimes the plywood is solid and just needs a clean scrape. Other times we find a soft spot around a toilet flange or a tub edge where water sat and the plywood swelled. That rot has to be cut out and replaced, and nobody knows it is there until the old tile and underlayment come up. Demo is where the real scope of a job shows up. A bathroom floor that looked fine before tear out can turn into a subfloor repair before a single new tile is set.

A long vanity wall with brass fixtures and tile run to the casing.
A long vanity wall with brass fixtures and tile run to the casing.

Dust control, debris, and haul off

We take dust seriously because tile dust does not just wipe up with a damp rag. It gets into ducts if you are not careful. We tape off the room with heavy plastic zip walls from floor to ceiling, cover vents, and run a negative air scrubber when the space allows it. The demo hammer is hooked to a vacuum that catches dust right at the chisel, not just in the air. It is still dusty work, but the containment keeps the rest of the house livable.

Debris piles up fast. Old tile, hardened thinset, and maybe a layer of cement board add up to hundreds of pounds of weight. We shovel it into heavy duty bags and carry it out by hand. Most of the time we load the debris straight into the truck and haul it off the same day. We do not leave a bag pile in your driveway for a week. On a larger tear out, like a whole ground floor of tile, we might stage the haul off over two trips, but the room is left broom clean before we move into prep. If you need a dumpster, we can talk about that on the phone, but for a bathroom, a shower, or a kitchen floor, our truck usually handles the whole load.

Why demo changes the scope of a tile job

Nobody can price prep work they cannot see, and the prep is under the old tile. Until that tile comes up and the thinset is chiseled off, what the substrate looks like is a guess. You might have a slab that needs a light grind and a crack isolation membrane. You might have a wood subfloor that needs a half inch of new plywood screwed down and a decoupling membrane laid over it. Those are two different jobs with different materials and different labor, and they both sit on the same line item called "prep."

That is why we do not publish a flat demolition price on a website. A tub surround removal where the old tile pops off clean is one thing. A kitchen floor where the thinset is epoxy based and chiseling takes twice as long is another. We quote demo and prep together after we talk to you about the room and, when the job is large or complicated, after we come see it in person. You call, we talk through what you are trying to do, and you get a straight quote that covers the tear out, the prep, and whatever the substrate tells us it needs.

Moving from demo into the new tile

Once the slab or wood subfloor is bare and cleaned, the prep work begins, and that prep is what makes the new tile last. For a shower floor, that means sloping dry pack mortar the right way. For a wood subfloor in a laundry room, it might mean a layer of cement board bedded in thinset and screwed off on the manufacturer's spacing. For a slab floor with a crack, it means rolling on a crack isolation membrane that stretches instead of tearing when the slab moves.

The tile material itself does not change how we prep, whether you picked a porcelain from the Temple supply house, a marble mosaic, or a handmade zellige. The substrate under it has to be flat, solid, and dry. How we get there depends on what demo uncovered. The same crew that ran the hammer and shoveled the debris is the crew that will mix the thinset and set the new tile. That means the people who saw the bare substrate with their own eyes are the same people who decide what it needs before tile goes down. If you have a tub surround you want torn out and redone, that work is $2,000 flat for the tile setting labor after demo and prep are handled, and we can walk you through the whole timeline on a call.

Questions

Asked and answered

Do I need to move out of the house during a tile demolition?

Most people stay in the house. We close off the work area with plastic walls and keep the dust contained to that room. The noise is the bigger inconvenience. A rotary hammer running on a slab floor for several hours is loud, and if you work from home, you will hear it through the walls. We usually start early and try to get the loudest part done in one stretch so the rest of the day is quieter haul off and cleanup. On a single bathroom job, it is manageable. On a whole house tear out, some families choose to stay with relatives for a couple of nights, but that is a personal call, not a requirement we set.

What happens if you find water damage under my old tile?

It depends on what we find. Water damage around a tub or shower is fairly common in older homes. If the plywood subfloor is soft or the drywall behind a tub surround is crumbling, we stop and show you what we are looking at before we touch it further. We are tile setters, not framers or plumbers, but we can cut out rotted subfloor and screw down new plywood to get a flat, solid surface for tile. If the damage goes into the wall studs or the joists, you may need a carpenter to sister in new framing before we proceed. We give you a straight answer on what we can handle and what needs another trade, and we wait until the repair is done before we move forward. Nobody wants new tile set over rotten wood.

Can you just remove the tile and leave the subfloor bare for me to do the rest?

We can, but we rarely recommend stopping halfway. A bare slab with old thinset ridges still on it is not a finished floor. If you plan to have somebody else install new flooring later, that floor will need a flat substrate, and the thinset we did not remove will still be there. We price demo to include getting the surface ready for tile, so the thinset comes off regardless. If your plan is to switch to vinyl plank and you want us to stop after demo, we can talk about that on the phone. The quote changes when we are not doing the prep and the new install, because the demo itself has to leave the floor in a state that works for the next material.

How long does a typical bathroom tear out take?

A standard bathroom floor and tub surround tear out, down to bare slab and bare stud walls, usually takes one day for the demolition and another half day for haul off and a thorough cleanup. If the old thinset is stubborn or the room is on a second floor where we have to carry debris down stairs, it can stretch into a second full day. A large kitchen or a whole ground floor of tile can run three or four days. We go over the timeline when we quote the job, and we tell you what to expect based on the square footage and what the old install looks like. The timeline is always our best read based on similar jobs we have done, not a contractual promise, because no one knows what the thinset bond is like until the hammer hits it.

Do I need to buy my new tile before you do the demolition?

No, and in fact it usually makes more sense to pick your tile after demo is done or at least after we have measured the bare space. The dimensions of a shower floor or a tub surround can change slightly once old tile and backer board are removed, and we want to measure the actual substrate before we order material so the layout and the cuts work out right. For floor tile, you can certainly start looking at porcelain or marble samples at the Temple supply house while we schedule the tear out, but we do not need a stack of tile boxes sitting in the garage while we are still running the hammer. We walk you through the timing during the quote call.

Get a quote

Tell us about the room.

Square footage, the tile you have in mind and when you want it done. We come back with a number for the whole job.

Every installation carries a written one-year limited labor warranty from the date of completion. It covers issues arising from our original installation. It does not cover materials, which fall under the manufacturer’s own warranty, and it does not cover modifications made after our installation is complete.