Situation

Tile after a leak

When water gets behind your tile or under your floor, we pull the wet materials, inspect the framing, let everything dry completely, and rebuild the tile assembly the right way from the studs out.

What we publish a price for. Those are the only prices on this site. Anything else, call (512) 297-7493 and we will look at the room and come back with a straight quote.

Finding the real path of the water before tearing into the wall

Water rarely stays where you see it. A dark grout line in a shower corner, a loose floor tile outside a tub, or a soft spot near a toilet usually means water has been traveling along the subfloor or down the studs for weeks. We come out to the house, look at the room, and trace the issue back to its source. We look for cracked grout joints, failed silicone at the tub ledger, missing waterproofing behind the cement board, or supply lines weeping inside the wall cavity.

In older Central Texas homes around Killeen and Temple, we often find regular drywall or basic green board used in wet areas with nothing more than thinset holding the tile. When water gets through the grout, that drywall turns into mush and loses all strength. You end up with tiles popping loose because the backing fell apart. We check the surrounding walls and floor transitions to see exactly how far the moisture spread before we start pulling anything off the wall.

Pulling back wet tile, backer board, and rotted wood

Trying to save water damaged tile is almost always a losing battle. Thinset sticks hard to the tile face, and removing the backer board destroys the substrate anyway. If water soaked into the wall cavity or subfloor, everything wet has to be removed down to clean, solid framing so the house can dry out properly.

  • Tile and ruined backer board stripped cleanly back to the dry wall studs
  • Swollen plywood subfloors and soft OSB cut out back to the center of the nearest floor joist
  • Rotted bottom plates, blocking, and stud bases exposed for carpentry repairs
  • Wet baseboards, vinyl plank, and damaged threshold transitions removed around the room perimeter
Full height glazed zellige shower with a brass rainfall head and a niche cut into the field.
Full height glazed zellige shower with a brass rainfall head and a niche cut into the field.

Letting the framing dry before closing up the space

You cannot tile over damp wood. If you trap moisture behind a new waterproofing membrane or under a new layer of cement board, the studs will warp, mold will grow, and fasteners will rust out. We coordinate with whoever is handling the moisture side and water mitigation on your property. The drying fans and dehumidifiers need to run until the moisture level in the wood framing and subfloor drops back to normal.

Once the structure is dry, we sister damaged studs, replace compromised subfloor sections, and make sure the framing is flat and plumb. A solid tile job requires a rigid substrate. If a floor joist has a bow or a wall stud is out of line, we correct it before hanging new cement board or backer panels. Taking the time to prep the framing properly prevents cracked tiles and broken grout down the road.

Rebuilding the waterproofing system to stop future leaks

Most tile leaks come down to improper waterproofing details. Tile and grout are not waterproof on their own. Water passes through grout joints and cementitious materials naturally. If the installer did not put a continuous, bonded waterproofing membrane behind the tile, that water enters the wall cavity. Common mistakes include puncturing pan liners too low, skipping sealant around valve penetrations, missing pre-slopes under shower pans, or building flat shower curbs that hold water.

When we rebuild, we build the wet area as a sealed vessel before a single tile is set. We use proper backer boards, seal all seams, and apply continuous waterproofing that laps over the tub flange or bonds to the shower drain. Shower floors are built with a consistent slope of one quarter inch per foot toward the drain so water drains away instead of sitting under the mud bed. For standard tub surrounds, our tile work is $2,000 flat, while custom showers and full room rebuilds are quoted after we inspect the room.

Setting new tile, grouting, and sealing the room

Once the prep work is complete, you choose your new tile. You can supply your own material or pick it out from the Temple supply house, where you can see porcelain, ceramic, marble, zellige, terrazzo, and mosaic options in person. What you pick is what gets set on your floor or wall. We bring the tile to the job site, plan out the cuts, and set everything with the proper thinset mortar and edge profiles, including clean satin or brass trims.

After the thinset cures, we pack the joints with grout, seal the surfaces where required, and caulk all plane changes with flexible sealant. We also install matching flooring transitions like reducers, stair noses, and thresholds to tie your new tile or vinyl plank back into the rest of the house. The same people who quote the job are the people who do the work, and every installation comes with our written one-year limited labor warranty from the date of completion.

Questions

Asked and answered

Can you replace just a few cracked or loose tiles without tearing out the whole wall?

Usually not if water is behind them. If water got behind the tile, the backer board underneath has likely broken down and the thinset bond is gone. Sticking a few replacement tiles into place over a wet, rotted substrate will only fail again in a few months. When water damage is present, the affected section or the whole surround has to come down so we can fix the substrate.

How long does the framing take to dry before you can start tiling?

It depends on how much water got into the framing and how quickly the drying equipment was set up. In most homes around Killeen and Belton, drying out the wood framing takes between three and five days with proper fans and dehumidifiers. We do not hang backer board or set tile until the wood is dry to the touch and ready for construction.

Do you repair the rotted wood framing and subfloors yourself?

Yes, we handle the subfloor and framing carpentry needed to get your floor or wall ready for new tile. We cut out rotted plywood or OSB, sister weakened joists, and replace damaged studs and bottom plates. We make sure the substrate is flat, solid, and properly supported before we install cement board or underlayment.

How much does tile rework after a water leak cost?

Because every leak involves a different amount of tearout, framing repair, and square footage, this kind of rework does not have a single fixed rate. You can call us at (512) 297-7493 for a straight quote after we inspect the room. For reference, standard tub surround tile work is $2,000 flat, but larger custom showers and floor rebuilds require an on-site look.

What is covered by your one-year labor warranty on a leak rebuild?

Our written one-year limited labor warranty covers issues arising from our original installation from the completion date. If a tile comes loose, a seam fails, or our labor causes a problem within that first year, we fix it. The warranty does not cover the tile or grout materials themselves, which carry manufacturer warranties, nor does it cover later changes made to the room.

Get a quote

Tell us about the room.

Square footage, the tile you have in mind and when you want it done. We come back with a number for the whole job.

Every installation carries a written one-year limited labor warranty from the date of completion. It covers issues arising from our original installation. It does not cover materials, which fall under the manufacturer’s own warranty, and it does not cover modifications made after our installation is complete.